Planning Documents

 
 

Copies of all project information, including the full application, can be found below.

Further details of the next steps and the planning process can be found here.

 

Proposed Changes Consultation Documents

Proposed Changes Non-technical Summary

Newsletter

Newspaper Advert

Project Red Line Boundary Map

Project Location Map

Application Guide, Draft DCO, and overview documents

1.1 Application Cover Letter

1.2 Application Guide

1.3 Application Form

1.4 Notices For Statutory Publicity

2.1 Draft Development Consent Order

2.2 Explanatory Memorandum

Land Acquisition Information

3.1 Book Of Reference

3.2 Statement Of Reasons

3.3 Funding Statement

Plans and Drawings

4.1 Site Location Plan

4.2 Land Plans

4.3 Works Plans

4.4 Access And Rights Of Way Plans

4.5 Crown Land Plan

4.6 Highway Works Plans

4.7 Indicative Proposed Power And Carbon Capture Layout, Elevations And Sections

4.8 Indicative Electrical Connection Plans

4.9 Indicative Cooling Water And Waste Water Connection Plans

4.10 Indicative Towns Water Connections Plan

4.11 Indicative Gas Supply Pipeline Connection Plans And Gas Above Ground Installation Plans

4.12 Indicative CO2 Above Ground Installation Plans

4.13 Indicative Surface Water Drainage Plan

4.14 Indicative General Arrangement And Elevations A18 Gatehouse

4.15 Indicative Landscape And Biodiversity Plan

4.16 Mabey Bridge Replacement General Arrangement And Sections

4.17 Emergency Access Bridge General Arrangement And Sections

4.18 SSE Land Ownership Plan

4.19 Haul Road Plans

4.20 Pilfrey Laydown Plans

Reports and Other Documents

5.1 Consultation Report

5.2 Electricity Grid Connection Statement

5.3 Gas Connection Statement

5.4 Schedule Of Other Consents And Licences

5.5 Planning Statement

5.6 Design And Access Statement

5.7 Combined Heat And Power Readiness Assessment

5.8 Carbon Capture Statement

5.9 Statutory Nuisance Statement

5.10 Landscaping And Biodiversity Management And Enhancement Plan

5.11 Indicative Lighting Strategy

5.12 Habitats Regulations Assessment Screening Report

7.1 Framework Construction Environmental Management Plan

7.2 Framework Construction Traffic Management Plan

7.3 Framework Construction Workers Travel Plan

7.4 Outline Written Scheme Of Investigation

Environmental Statement Non-Technical Summary and Main Volume

6.1 Environmental Statement Non-Technical Summary

6.2.0 Cover, Table Of Contents And Environmental Statement Glossary

6.2.1 ES Chapter 1 Introduction

6.2.2 ES Chapter 2 Assessment Methodology

6.2.3 ES Chapter 3 The Site And Surrounding Area

6.2.4 ES Chapter 4 The Proposed Development

6.2.5 ES Chapter 5 Construction Programme And Management

6.2.6 ES Chapter 6 Consideration Of Alternatives

6.2.7 ES Chapter 7 Legislative Context And Planning Policy

6.2.8 ES Chapter 8 Air Quality

6.2.9 ES Chapter 9 Noise And Vibration

6.2.10 ES Chapter 10 Traffic And Transportation

6.2.11 ES Chapter 11 Biodiversity And Nature Conservation

6.2.12 ES Chapter 12 Water Environment And Flood Risk

6.2.13 ES Chapter 13 Geology, Hydrogeology And Land Contamination

6.2.14 ES Chapter 14 Landscape And Visual Amenity

6.2.15 ES Chapter 15 Cultural Heritage

6.2.16 ES Chapter 16 Socio-Economics

6.2.17 ES Chapter 17 Climate Change And Sustainability

6.2.18 ES Chapter 18 Major Accidents And Disasters

6.2.19 ES Chapter 19 Cumulative And Combined Effects

6.2.20 ES Chapter 20 Summary Of Likely Significant Residual Effect

Environmental Statement Figures and Appendices

6.3.0 ES Cover And Table Of Contents

6.3.1 ES Appendix 1A Environmental Impact Assessment Scoping Report

6.3.2 ES Appendix 1B Scoping Opinion

6.3.3 ES Appendix 1C Statement Of Competence

6.3.4 ES Appendix 2A PINS Transboundary Screening Matrix

6.3.5 ES Appendix 8A Air Quality Construction Phase

6.3.6 ES Appendix 8B Air Quality Operational Phase

6.3.7 ES Appendix 8C Air Quality Assessment Of Amine Degradation Products

6.3.8 ES Appendix 9A Construction Noise Assessment Methodology

6.3.9 ES Appendix 9B Operational Noise Information

6.3.10 ES Appendix 10A Transport Assessment

6.3.11 ES Appendix 10B Stage 1 Road Safety Audit

6.3.12 ES Appendix 11A Biodiversity And Nature Conservation Legislation

6.3.13 ES Appendix 11B Ecological Impact Assessment Methods

6.3.14 ES Appendix 11C Preliminary Ecological Appraisal Report

6.3.15 ES Appendix 11D Confidential Badger Survey Report

6.3.16 ES Appendix 11E Bat Survey Report

6.3.17 ES Appendix 11F Riparian Mammal Survey Report

6.3.18 ES Appendix 11G Aquatic Ecology Survey Report

6.3.19 ES Appendix 11H Underwater Sound Effects On Fish

6.3.20 ES Appendix 12A Flood Risk Assessment

6.3.21 ES Appendix 12B Water Framework Directive Assessment

6.3.22 ES Appendix 12C Navigational Risk Assessment

6.3.23 ES Appendix 13A Phase 1 Desk Based Assessment

6.3.24 ES Appendix 13B Land Contamination Methodology Tables

6.3.25 ES Appendix 13C Potential Areas Of Contamination Further Risk And Impact Assessment

6.3.26 ES Appendix 14A Landscape And Visual Impact Assessment Methodology

6.3.27 ES Appendix 14B Potential Viewpoints

6.3.28 ES Appendix 14C Landscape Character

6.3.29 ES Appendix 15A Cultural Heritage Desk Based Assessment

6.3.30 ES Appendix 15B Geoarchaeological Hand Auger Survey Fieldwork Report

6.3.31 ES Appendix 15C Geophysical Survey Fieldwork Report

6.3.32 ES Appendix 16A Population And Health Signposting

6.3.33 ES Appendix 17A Sustainability Review

6.3.34 ES Appendix 20A Schedule Of Commitments

6.4.0 ES Cover And Table Of Contents

6.4.1 ES Figure 1.1 Site Location Plan

6.4.2 ES Figure 3.1 The Order Limits

6.4.3 ES Figure 3.2 Aerial Photo Of The Order Limits

6.4.4 ES Figure 3.3 Indicative Work Areas Referred To In The Environmental Statement

6.4.5 ES Figure 3.4 Constraints Within 5Km Of The Order Limits

6.4.6 ES Figure 3.5 Marine Area

6.4.7 ES Figure 4.1 Indicative Layout Proposed PCC Site

6.4.8 ES Figure 5.1 Construction Laydown Areas

6.4.9 ES Figure 8.1 Air Quality Operation Study Area Human Health Receptors

6.4.10 ES Figure 8.2 Air Quality Operation Study Area Ecology Receptors

6.4.11 ES Figure 8.3 Air Quality Construction Study Area

6.4.12 ES Figure 8.4 Operational Study Area Modelled Buildings

6.4.13 ES Figure 8.5 Air Quality Study Area Monitoring Locations

6.4.14 ES Figure 8.6 Annual Mean Nitrogen Dioxide Process Contribution 2015 Meteorological Year

6.4.15 ES Figure 8.7 99.79Th Percentile 1 Hour Mean Nitrogen Dioxide Process Contribution 2015 Meteorological Year

6.4.16 ES Figure 8.8 Annual Mean Oxides Of Nitrogen Process Contribution 2015 Meteorological Year

6.4.17 ES Figure 8.9 Maximum 24 Hour Mean Oxides Of Nitrogen Process Contribution 2017 Meteorological Year

6.4.18 ES Figure 9.1 Noise Sensitive Receptors

6.4.19 ES Figure 9.2 Main Civil Works Construction Noise Level Predictions

6.4.20 ES Figure 9.3A Operational Noise Level Predictions (Unmitigated Scenario)

6.4.21 ES Figure 9.3B Operational Noise Level Predictions (Mitigated Scenario)

6.4.22 ES Figure 11.1 Statutory Nature Conservation Designations

6.4.23 ES Figure 11.2 Non Statutory Nature Conservation Designations

6.4.24 ES Figure 12.1 Surface Waterbodies And Their Attributes

6.4.25 ES Figure 12.2 Groundwater Waterbodies And Their Attributes

6.4.26 ES Figure 12.3 Flood Risk

6.4.27 ES Figure 12.4 Surface Water Flood Risk

6.4.28 ES Figure 12.5 Ecologically Designated Sites Relevant To The Water Environment

6.4.29 ES Figure 12.6 Internal Drainage Board Assets

6.4.30 ES Figure 13.1 Indicative DCO Site

6.4.31 ES Figure 13.2 Identified Historical And Current Areas Of Potential Contamination

6.4.32 ES Figure 14.1 Landscape Character Areas And Types

6.4.33 ES Figure 14.2 Topography

6.4.34 ES Figure 14.3 Landscape Context

6.4.35 ES Figure 14.4 Zone Of Theoretical Visibility And Potential Viewpoint Locations

6.4.36 ES Figure 14.5 Representative Viewpoints

6.4.37 ES Figure 14.6 Viewpoint 1

6.4.38 ES Figure 14.7 Viewpoint 2

6.4.39 ES Figure 14.8 Viewpoint 3

6.4.40 ES Figure 14.9 Viewpoint 4

6.4.41 ES Figure 14.10 Viewpoint 5

6.4.42 ES Figure 14.11 Viewpoint 6

6.4.43 ES Figure 14.12 Viewpoint 7

6.4.44 ES Figure 14.13 Viewpoint 8

6.4.45 ES Figure 14.14 Viewpoint 9

6.4.46 ES Figure 14.15 Viewpoint 10

6.4.47 ES Figure 14.16 Viewpoint 11

6.4.48 ES Figure 14.17 Viewpoint 12

6.4.49 ES Figure 14.18 Viewpoint 13

6.4.50 ES Figure 14.19 Viewpoint 1 Photomontage

6.4.51 ES Figure 14.20 Viewpoint 2 Photomontage

6.4.52 ES Figure 14.21 Viewpoint 4 Photomontage

6.4.53 ES Figure 14.22 Viewpoint 5 Photomontage

6.4.54 ES Figure 14.23 Viewpoint 6 Photomontage

6.4.55 ES Figure 14.24 Viewpoint 13 Photomontage

6.4.56 ES Figure 15.1 Locations Of Designated Heritage Assets

6.4.57 ES Figure 15.2 Locations Of Non Designated Heritage Assets

6.4.58 ES Figure 15.3 Locations Of Non Designated Assets Inset A And B

6.4.59 ES Figure 19.1 Long List Of Developments Initially Considered For Cumulative Impact Assessment

6.4.60 ES Figure 19.2 Short List Of Developments Considered In Cumulative Impact AssessmentS Chapter 20 Summary Of Likely Significant Residual Effects

 

Further Environmental Information (July 2021)

8.1 Additional Environmental Information

Pre-application Documentation

Privacy Notice

Section 48 Notice

PEI Report Addendum

Site Location Plan

Project Privacy Notice

Stage Two Consultation

Stage Two Newsletter

Zero Carbon Humber Information

Overview of the NSIP Process

Information Banners

PEIR - Non-Technical Summary

PEIR 01 Volume I Cover Contents and Glossary

PEIR Chapter 1 Introduction

PEIR Chapter 2 Assessment Methodology

PEIR Chapter 3 The Site And Surrounding Area

PEIR Chapter 4 The Proposed Development

PEIR Chapter 5 Construction Programme And Management

PEIR Chapter 6 Consideration Of Alternatives 

PEIR Chapter 7 Legislative Context And Planning Policy

PEIR Chapter 8 Air Quality

PEIR Chapter 9 Noise And Vibration 

PEIR Chapter 10 Traffic And Transport 

PEIR Chapter 11 Biodiversity

PEIR Chapter 12 Water Environment

PEIR Chapter 13 Geology, Hydrogeology And Contaminated Land

PEIR Chapter 14 Landscape And Visual Amenity

PEIR Chapter 15 Cultural Heritage 

PEIR Chapter 16 Socio-Economics

PEIR Chapter 17 Climate Change And Sustainability 

PEIR Chapter 18 Major Accidents And Disasters

PEIR Chapter 19 Cumulative And Combined Effects 

PEIR Chapter 20 Summary

01 Volume II Cover, Contents And Glossary

Appendix 1A Scoping Report

Appendix 1B Scoping Opinion

PEIR Appendix 1C Matters Addressed 

PEIR Appendix 8A Air Quality Construction

PEIR Appendix 8B Air Quality Operation

PEIR Appendix 9A Construction Noise Assessment Methodology 

PEIR Appendix 9B Operational Noise Information 

PEIR Appendix 10A Transport Assessment

PEIR Appendix 11A Legislation And Planning Policy

PEIR Appendix 11B Ecia Methods

PEIR Appendix 11C PEA Report

PEIR Appendix 11D Confidential Badger Report

PEIR Appendix 11E Bat Survey Report 

PEIR Appendix 11F Riparian Mammal Survey Report 

PEIR Appendix 11G Aquatic Ecology Report

PEIR Appendix 12A Flood Risk Assessment Part 1

PEIR Appendix 12A Flood Risk Assessment Part 2

PEIR Appendix 12B WFD Screening

PEIR Appendix 13A Phase 1 DBA Part 1

PEIR Appendix 13A Phase 1 DBA Part 2

PEIR Appendix 13B Land Contamination Methodology Tables

PEIR Appendix 13C Potential AOC Baseline Risk Scores

PEIR Appendix 14A LVIA Methodology

PEIR Appendix 14B Potential Viewpoints

PEIR Appendix 14C Landscape Character

PEIR Appendix 15A Cultural Heritage DBA

PEIR Chapter 16A Human Health Signposting 

PEIR 01 Volume III Cover And Contents

PEIR Figure 1.1 Site Location Plan

PEIR Figure 3.1 Indicative DCO Site

PEIR Figure 3.2 Areas Of The Site

PEIR Figure 3.3 Aerial Photo Of Indicative DCO Site

PEIR Figure 3.4 Constraints Within 5Km

PEIR Figure 4.1 Indicative Layout Proposed PCC Site

PEIR Figure 8.1 Air Quality Operational Study Area HH Receptors

PEIR Figure 8.2 Air Quality Operational Study Area Ecol Receptors

PEIR Figure 8.3 Air Quality Construction Study Area

PEIR Figure 8.4 Air Quality Operational Study Area

PEIR Figure 8.5 Annual Mean Nitrogen Dioxide PC

PEIR Figure 8.6 99.79Th Percentile 1 Hour Mean Nitrogen PC

PEIR Figure 8.7 Annual Mean Oxides Of Nitrogen PC

PEIR Figure 8.8 Maximum 24 Hour Mean Oxides Of Nitrogen

PEIR Figure 9.1 Noise Sensitive Receptors

PEIR Figure 12.2 Groundwater Waterbodies

PEIR Figure 12.3 Flood Risk

PEIR Figure 12.4 Surface Water Flood Risk

PEIR Figure 12.5 Ecologically Designated Sites Water Environment

PEIR Figure 14.1 Landscape Character Area

PEIR Figure 14.2 Topography

PEIR Figure 14.3 Landscape Context

PEIR Figure 14.4 ZTV And Potential Viewpoint Locations

PEIR Figure 14.5 Representative Viewpoints

PEIR Figure 14.6 14.18 Photoviewpoints

PEIR Figure 14.19 14.24 Wirelines

PEIR Figure 19.1 Other Developments Cumulative Impact Assessment

Statement of Community Consultation (SoCC)

SoCC Notice